Recently, Yan Ping, chairman of Yuchai United Power Co., Ltd. (YUP), together with directors including Li Yinhui, Wang Min, Zhong Yuwei, Lin Zhiqiang, Tang Gang, Tu Xiaoyue and Liang Heping, enthusiastically visited YUPs plant and production line on the sidelines of the fourth session of the first board of directors of YUP, speaking highly of the project progress and great change in the plant, The test bed with the energy recovery system is good, which meets the requirements for environmental protection. Yan noted that the bed should be popularized. According to the source, it takes an hour to test an engine. Take 6K10 testing for example, the bed recovers 175 kWh of electricity and 130 kWh of heat, becoming an international model in test bed energy recovery. YUPs practice of developing test beds for outgoing inspection is a qualitative improvement among domestic counterparts. The bed tests 56 parameters, including general parameters, as well as added characteristic parameters such as mechanical efficiency, dynamic response, spectrum analysis consistency, noise, vibration, database comparison, NOx and CAN communication parameter comparison.
(Liu Xiaojuan)